Letar Inc. complies with Bombardier’s QD 4.6-40, Quality Requirements for Suppliers, and is recognized for maintaining acceptable product delivery performance
Current Bombardier approvals include:
· Classification A – Subcontractor
· BAPS175-005 INSTALLATION OF INTERFERENCE FIT BUSHINGS Authorized thermal operation: cooling of bushing in liquid nitrogen only
· BAPS145-002 ELECTRICAL BONDING OF AIRCRAFT Surface preparation metal-metal bonds only
· BAPS150-003 INSTALLATION OF SAFETYING DEVICES Lock Wire installation only
· BAPS151-001 INSTALLATION OF CONVENTIONAL RIVETS limited to Manual riveting
· BAPS160-020 CHEMICAL CONVERSION TREATMENT FOR ALUMINUM ALLOYS Type 2- Touch-up
· BAPS160-040 CONDUCTIVE CHEMICAL CONVERSION TREATMENT FOR ALUMINUM ALLOYS Type 2-Touch-up
· BAPS168-013 HARDNESS AND ELECTRICAL CONDUCTIVITY TESTING OF METALS
· BAPS175-005 INSTALLATION OF INTERFERENCE FIT BUSHINGS Authorized thermal operation: cooling of bushing in liquid nitrogen only
You must be logged in to post a comment.